Melton South Building
Inspections

Booking stage inspections on a Melton South build

Where the windows sit in a City of Melton program.

Owner Inspections · Melton South 3338 · 2026-04-21

In short: Trades follow closely. These are the moments before work disappears.

The program is fixed

An estate build runs to a schedule and the gap before the covering trade is short.

Slab pre-pour

Collars, barrier, mesh and cover. All permanent the moment concrete arrives.

Frame

Where the slab and timber meet: overhang, rebate condition and truss bracing.

Lock-up

Insulation and sarking, visible for days before plaster.

The membrane stage

After the membrane, before the tiler.

Pre-handover

A week before completion, so the list is with the builder before you sign.

Written by the Owner Inspections team from inspections carried out in Melton South. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Melton South

All guides →

Book a building inspection in Melton South

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Melton South owners ask about this

If only two?

Frame and pre-handover.

How much notice?

A day or two, earlier is better.

Do dates move?

Often.

All seven?

It gives the fullest record of the build.

CallGet a Free Quote