Melton South Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Slab pre-pour inspection in Melton South

Termite collars, vapour barrier, mesh and cover, checked in the last hours they exist as anything other than concrete.

  • The day before the pour, with steel, pods and formwork open
  • About 1 hour on site
  • Report within 24 hours
Price a Melton South inspectionA minute to fill in, and nothing is locked in.

Fully licensed & accredited

Stage2 of 7
When to bookThe day before the pour, with steel, pods and formwork open
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Melton South slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Melton South builds

The two findings that repeat on Melton South slabs are termite collars left off plumbing penetrations and the vapour barrier laid over the steel instead of under it. Both are invisible forever once the pour happens.

What we find at this stage in Melton South

  • Termite collars missing from slab penetrations
  • Vapour barrier laid over the steel rather than beneath
  • Slab mesh sagging where it is not properly fixed
  • N16 bars absent around service penetrations
  • Beam width inconsistent from movement
  • Stormwater and sewer pipes damaged before the pour
Stormwater or sewer pipe damaged before the pour, Melton South
Stormwater or sewer pipe damaged before the pour
Sample findings

Sample defects found during our slab pre-pour inspections in Melton South

Annotated findings from Slab pre-pour inspections on Melton South builds. Client addresses withheld.

Termite collars missing from slab plumbing penetrations, noted during a slab pre-pour inspection in Melton South
Termite collars missing from slab plumbing penetrations
Vapour barrier lying over the steel instead of beneath it, noted during a slab pre-pour inspection in Melton South
Vapour barrier lying over the steel instead of beneath it
Slab mesh sagging where it is not properly fixed, noted during a slab pre-pour inspection in Melton South
Slab mesh sagging where it is not properly fixed
N16 bars not installed around service penetrations, noted during a slab pre-pour inspection in Melton South
N16 bars not installed around service penetrations

The other stages of a Melton South build

  1. Bored piers inspection in Melton South1Bored piersAfter boring and cage placement, ahead of concrete
  2. Frame inspection in Melton South3FrameOnce frame and trusses are up and the roof is on, before sarking
  3. Lock-up (pre-plaster) inspection in Melton South4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Melton South5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Melton South6WaterproofingOnce the membrane is on and cured, before tiling
  6. Pre-handover (PCI) inspection in Melton South7Pre-handover (PCI)Roughly a week ahead of practical completion

All construction stage inspections in Melton South →

Guides

Construction stage guides for Melton South

All guides →

Book a slab pre-pour inspection in Melton South

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Melton South: common questions

Why do termite collars matter?

They seal the gap where a pipe passes through the slab. Without one, that gap is a concealed path straight into the house, and it cannot be added later.

What does the vapour barrier do?

It stops ground moisture rising through the slab. Laid over the steel instead of under it, it is in the wrong plane to work.

How far ahead should I let you know?

A day is usually enough, but tell us as soon as a pour date exists.

Will it delay the pour?

That question sits between you and your builder. Most findings take an hour.

Which standard applies?

AS 2870 with the engineering for your lot.

Can it be checked afterwards?

No. Concrete is final.

CallGet a Free Quote