Mouldings, doors and joinery are in and painting is next. Anything caught now is fixed before paint rather than cut back after.
Infills around window and door heads are the recurring Melton South item, along with expansion joints left unsealed and plaster not brought flush at the garage.

Annotated findings from Fixing inspections on Melton South builds. Client addresses withheld.




1Bored piersAfter boring and cage placement, ahead of concrete
2Slab pre-pourThe day before the pour, with steel, pods and formwork open
3FrameOnce frame and trusses are up and the roof is on, before sarking
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
6WaterproofingOnce the membrane is on and cured, before tiling
7Pre-handover (PCI)Roughly a week ahead of practical completionInstant online pricing, or talk to the booking team on 1300 471 805.
They close the gap above and beside an opening. Left incomplete, the gap is either visible forever or filled badly after paint.
If budget allows. Items caught before paint are cheap to fix.
The Guide to Standards and Tolerances 2015 for alignment, gaps and finish.
Yes, alignment, gaps and hardware worked by hand.
No appliance testing, no energising, no commissioning.
Around two hours for a typical Melton South home.